Skip to content

Prior information request in one week. Signed, filed and followed through.

We assess your property's building feasibility and prepare your PIP. Our architects sign it and we file it with the city council, in Porto or any other municipality in Portugal. Then we follow the process through to the decision.

PIP application

From plot to construction. We prepare, sign, file and follow up.

Our technology prepares the prior information request, our architects review and sign it, and we file it with the council and follow every step until the decision.

Property We locate the building and draw the plot. 1 of 4
Plot area · 412 m²
Property tax record Article, areas and boundaries confirmed Analyzing Checked

One week to the council. Without the months of waiting.

Our technology prepares the request. The week goes to talking with you and to our architects reviewing and signing it. Then we follow the request through to the council's decision.

  1. Day 1

    Conversation

    We talk with you about the property, what you plan to do and the documents you have.

  2. After the conversation

    Preparation

    Our technology assesses building feasibility: it checks the PDM and constraints and drafts the request.

  3. Days 2 to 6

    Review and signature

    Our architects review the request and sign it, with professional responsibility. This is the longest step.

  4. Day 7

    Filing

    We file the PIP with the city council and keep the proof of filing.

After filing

Council review

The council has its own legal deadlines. We answer requests for documents and follow the process through to the decision.

Once the PIP is approved

Design and engineering

If you want to go ahead with the architectural design, we do it with you, along with the engineering projects (especialidades), such as structure and utilities.

Building feasibility. What the land allows.

Height limit, buildable area, permitted uses and easements, checked against the PDM (municipal master plan) and the project you have in mind, before you buy or design.

  • Permitted height limit
  • Lot under analysis
Lot analysis Point at a lot See how much it can still grow.

For those who decide. Property, investment, design, construction.

  • Owners

    Check your property's building feasibility.

  • Developers

    Test the project before you invest.

  • Architects

    Start from a sound regulatory base.

  • Builders

    Confirm what can be built before you price the job.

Across the country. From Porto.

We work from Porto and file the PIP with any municipality in Portugal, on the mainland, in the Azores and in Madeira.

Where we work 308 municipalities From the Minho to the Algarve, and on the islands.

Services. From the PIP to licensing.

Planning and licensing in Porto and other municipalities across Portugal.

Have a property in mind? Tell us your idea.

We reply within about 2 hours during business hours, then prepare a proposal for your project.

geral@aptogroup.eu

Porto · Portugal

Contact details and request details
What is your situation? *