The licença de utilização (use permit, usually called a habitation license in English), which the law later renamed autorização de utilização and which people often call licença de habitação or de habitabilidade, is the municipal title confirming that a building or unit can be used for a specific purpose, such as housing, retail or offices. Since October 1, 2026, the Câmara Municipal (city council) no longer issues it: use is now covered by a prior notice filed with the council, and licenses issued before remain valid. A house built before the RGEU applied in its area never needed one. This guide explains what changed, how to sort out the use title of an existing home today, what the deed requires when you sell or buy, and when the case becomes a legalization.
To apply these checks to a property in Porto or elsewhere in Portugal, see our building legalization and change of use services.
01 What the habitation license is, and why people call it a licença de habitação
The licença de utilização is the act by which the Câmara Municipal confirms that a building, or a unit within it, can be used for its intended purpose. It was made general by the RGEU (Regulamento Geral das Edificações Urbanas, the general building regulation approved by Decree-Law 38382 of August 7, 1951), whose article 8 required it for new, rebuilt, extended or altered buildings. Later, the RJUE (Regime Jurídico da Urbanização e Edificação, Portugal's planning and building code, Decree-Law 555/99) renamed it autorização de utilização, which is the name you will see on more recent permits.
Licença de habitação and licença de habitabilidade are not different permits: they are popular names for the use permit of a home, because the use it authorizes is housing. What matters is the use stated on the title. A unit licensed for retail or offices is not authorized as a home, and switching from one use to the other is a change of use.
The license confirmed two things: that the work matched the approved design and that the use was allowed under the applicable rules. Do not confuse it with the caderneta predial (property tax record) or with the land registry description: neither proves that the council authorized the work or the use. The use title passes automatically with the property (RJUE article 4-A(13)).
02 What changed in 2024 and in October 2026
The habitation license did not disappear overnight. The Simplex reform (Decree-Law 10/2024) began phasing it out in 2024, and the RJUE revision by Decree-Law 108/2026, in force since October 1, 2026, a date set by Decree-Law 155-B/2026, completed the change. Habitation licenses and use permits issued before remain valid as the use title.
If your home already has a license, you do not need to do anything. If it does not, the fix today is one of the notices explained below or, if there is unpermitted work, a legalization. The table sums up the dates that matter.
| Date | What changed | Legal basis |
|---|---|---|
| January 1, 2024 | The use permit and the ficha técnica da habitação (home technical file) no longer had to be shown at the deed of sale | Decree-Law 10/2024, which repealed Decree-Law 281/99 |
| March 4, 2024 | After works under a license or comunicação prévia (prior notice), use no longer depended on council authorization: filing the site manager's or supervising engineer's statement of responsibility was enough. A change of use without works became a comunicação prévia com prazo (prior notice with a waiting period) | Decree-Law 10/2024 (RJUE articles 62-A and 62-B) |
| October 1, 2026 | Councils stopped issuing habitation licenses or use permits, and legal references to them are now read as a comunicação prévia or a comunicação prévia com prazo. The deed must now state whether the property has a planning title | Decree-Law 108/2026 (article 9(2)) and RJUE article 4-A(14) |
03 How to check whether your home has a habitation license
The reliable way is to look at the property's building file at the Câmara Municipal. It should contain the building permit, the approved plans and the habitation license or use permit, with the authorized use. If the license exists but you have lost the document, ask for a certificate or copy: in Porto, the certificates service on the Portal do Munícipe issues copies of use permits and certificates of a building's or unit's use, with a stated average response time of 30 working days for planning file requests.
When you read the file, there are four possible answers, and each one leads somewhere different:
- There is a habitation license or use permit and the house matches the approved plans: the title is in order and passes to the buyer with the property.
- There is a building permit but no habitation license: the process was never completed and is usually fixed with a use notice, if what was built matches what was approved.
- There is no file and the house is old: it may predate the RGEU in that area and never have needed a license.
- What exists differs from what was approved, or a post-RGEU house has no permit at all: it is a legalization case.
04 Pre-1951 houses: when there was never a license
Buildings constructed before the RGEU applied in their area were not subject to the habitation license, so it is normal for them not to have one: they are not illegal houses. Article 1 of the RGEU applied it to municipal seats and other towns with an urban plan; elsewhere, it only applied once the municipality extended it. In many rural areas the duty began after 1951, and the date to confirm with the council is when the RGEU began to apply in that place.
Since October 1, 2026, the RJUE addresses these cases directly: a building's “último antecedente válido” (last valid legal status) includes work that needed no permit when it was carried out (RJUE article 2(r)). Later work done without a permit is not covered and may need to be legalized. To prove the date, some councils issue a dedicated certificate; in Porto it is the “certificação de que uma construção é anterior a 1951” (certificate that a building predates 1951). The usual evidence, such as tax history and old aerial photos, is covered in our guide to legalizing an old house and annexes.
05 How to get a use title for an existing building today
Since October 1, 2026, “getting the habitation license” means filing a notice with the council, on the national form approved by Portaria 320/2026/1 (a ministerial order), together with the professionals' statements of responsibility. The council no longer approves the use: it checks afterward, and only inspects when there are serious signs that the building is not fit for the intended use.
In a building under propriedade horizontal (condominium ownership), the notice can cover the whole building or each unit, and the council can object to the use if the common areas are not fit to be used (RJUE article 66); for an apartment, check the building's position too. The table shows which route applies to each situation.
| Building situation | Procedure | Who signs and when you can use it |
|---|---|---|
| Completed work under a license, comunicação prévia or a full PIP that exempted it | Comunicação prévia (RJUE article 62-A) | The site manager or supervising engineer, or another qualified professional if that is no longer possible; use as soon as it is filed |
| Use or change of use with no works, or only exempt works | Comunicação prévia com prazo (RJUE articles 62-B, 63 and 64) | Qualified professionals, on the compliance of the use and the building's fitness; use 10 days after filing, unless rejected or inspected |
| Habitation license or use permit issued before | None | It remains valid and passes with the property |
| House predating the RGEU in that area, with no later work | No title to obtain; gather evidence of the date | A council certificate, where available, or other evidence |
| Work without a permit or different from what was approved | Legalization (RJUE article 102-A), then the applicable use notice | Depends on the file; see the section on legalization |
06 The use notice step by step: statements, deadlines and inspection
For the comunicação prévia com prazo, the usual route for an existing house with no recent works, the law requires two statements of responsibility. One, signed by someone qualified to author an architectural design, declares that the intended use is allowed under the rules that set permitted uses, such as the PDM (Plano Diretor Municipal, the municipal master plan); the other, signed by a professional qualified as a site manager or supervising engineer, declares that the building is fit for that purpose (RJUE article 63). The remaining documents are listed in Portaria 320/2026/1.
Fees are set in each municipality's regulation and fee schedule; check them before you file. On top of them come the fees of the professionals who sign the statements and, if needed, a survey of the existing building. The legal deadlines, on the other hand, are short:
- 10 days: once 10 days have passed since filing, the building can be used for the stated purpose (RJUE article 64(1)).
- Within those 10 days, the mayor can reject the notice if it is incomplete or the use clearly breaches the rules, or order an inspection if there are serious signs that the building is not fit for purpose (RJUE article 64(2)).
- Inspection: it takes place within 15 days and ends with a declaration of compliance or an order to carry out works. Once the works are done, the new inspection takes place within 10 days of your request and, if it does not happen in that time, the council can no longer object to the use (RJUE article 65).
- Title: the use is covered by the completed form, the filing receipt and the proof of fee payment, plus the declaration of compliance if there was an inspection (RJUE article 4-A(4)). Keep these documents: they are what you show at the deed.
07 Selling a house without a habitation license: what the deed requires
No law forbids selling a house in Portugal without a habitation license. What has changed over time is what the escritura (the deed of sale) must contain, and the table sums up the three regimes.
For sellers, the 2026 rule means the buyer learns from the deed itself whether there is a title. A pre-RGEU house can be sold, and the certificate or evidence of the date helps the seller make the declaration with confidence. If the title exists but you cannot find it, request the certificate before booking the deed.
| Period | What the deed requires | Legal basis |
|---|---|---|
| Until December 31, 2023 | Showing the habitation license, or the building permit, to whoever executed the deed | Decree-Law 281/99 |
| January 1, 2024 to September 30, 2026 | No duty to show the license or the home technical file; whoever executed the deed warned the buyer that the property might not have the planning titles | Decree-Law 10/2024, article 19 |
| Since October 1, 2026 | A statement that the planning title was shown, or that the seller declares having one, or that the seller declares not having one; without it, the sale can be annulled | RJUE article 4-A(14) |
08 Buying a house without a habitation license: what to check
The seller's declaration in the deed informs you, but it does not fix anything. The title passes with the property, and so do the problems: if there is unpermitted work, enforcement measures may be directed at the new owner. Before signing the promissory contract (contrato-promessa), check:
- The municipal file: a habitation license or use permit, a use notice with its receipts, or proof that the property predates the RGEU in that area.
- Whether the use on the title matches what you plan to do, for example housing or short-term rental (alojamento local).
- Whether the current floor area and layout match the approved plans, including annexes, enclosed balconies and attics.
- Whether your bank will finance the property with the documents it has.
- Whether the promissory contract should be conditional on obtaining the title or legalizing the work.
09 When the case becomes a legalization
A use notice only works when what exists has a permit or never needed one. If the house, or part of it, was built without a license or comunicação prévia when they were required, or if what exists differs from what was approved, the work must first be legalized (RJUE article 102-A) and only then can the use be filed. Typical cases are extensions, annexes beyond the limits for exempt works, enclosed balconies, attics turned into living space and units used for a purpose other than the licensed one.
Legalization is only possible if the work complies, or can be made to comply with corrections, with the rules in force, above all the PDM; the council may waive technical rules that have become impossible to meet if the work complied with those of its time. The procedure, documents and deadlines are covered in our guide to how building legalization works.
It is best not to wait. Using a building without the required notice, or for a use other than the one on the title, is an administrative offense punishable by a fine of €500 to €100,000 for individuals and €1,500 to €250,000 for companies (RJUE article 98), and the council can order the use to stop (article 109). Apto Group reviews the municipal file and identifies the right route through our building legalization service. If you want to change the use, a prior information request (PIP) can confirm first whether the PDM allows it.
10 Frequently asked questions
Does the habitation license still exist in Portugal?
It is no longer issued. Since October 1, 2026, use is covered by a comunicação prévia after works under a license or prior notice, or by a comunicação prévia com prazo in all other cases. Habitation licenses and use permits issued before remain valid and pass with the property.
Are licença de habitação, de habitabilidade and de utilização the same thing?
In practice, yes. Licença de habitação and licença de habitabilidade are popular names for a home's licença de utilização; council documents call it a licença or autorização de utilização and state the authorized use. That use is what you need to check.
Can I sell a house without a habitation license in Portugal?
Yes. No law forbids the sale. Since October 1, 2026, the deed must state whether the property has a planning title or include the seller's declaration of having one or not; without that statement, the sale can be annulled. A pre-RGEU house never needed a license, and it is wise to have evidence of that.
I lost my habitation license. How do I get a copy?
Ask the council that issued it for a certificate or copy. In Porto, you apply through the certificates service on the Portal do Munícipe, which covers use permits and certificates of a building's or unit's use, with a stated average response time of 30 working days for planning files.
How long does it take to get a use title?
After works under a license or prior notice, the property can be used as soon as the notice is filed. With a comunicação prévia com prazo, after 10 days, unless the council rejects it or orders an inspection, which takes place within 15 days. If work needs legalizing first, the timeline is that of the legalization.
Does the caderneta predial replace the habitation license?
No. The caderneta predial is a tax document and the land registry description is a registry record; neither proves that the council authorized the work or the use. Even so, the date the property was entered in the tax register can help prove that a house predates the RGEU.
11 Official sources consulted
The official sources are in Portuguese. Check the version in force before preparing a notice, project or application.
- Diário da República — RGEU (Decree-Law 38382/1951)
- Diário da República — consolidated RJUE (articles 2, 4-A, 62-A to 66, 98, 102-A and 109)
- Diário da República — Decree-Law 108/2026 of May 29
- Diário da República — Decree-Law 155-B/2026 of July 31
- Diário da República — Decree-Law 10/2024 (Simplex reform)
- Diário da República — Portaria 320/2026/1 of July 31
- Porto City Council — Certificates, including pre-1951 construction and building use
Want to find these guides more easily when you search on Google? Add Apto Group as a preferred source.