Skip to content

PIP before buying land in Portugal: a buyer's guide

When to file a PIP before buying land in Portugal, which type to choose, how to make the purchase contract depend on the council's answer and how to check an "approved PIP" in a listing.

Filing a PIP before you buy land in Portugal tells you, in writing and with binding effect, whether the câmara municipal (city council) accepts the project that justifies the price. Anyone with an interest can file one, even before owning the plot, and the council has 15 days (simple PIP) or 30 days (extended PIP) to decide after its initial check; if it misses the deadline, the PIP is deemed approved. This guide explains which PIP to choose, how to tie the purchase contract to the result and how to verify an "approved PIP" in a listing.

To apply these checks to a property in Porto or elsewhere in Portugal, see our prior information request service.

01 Why file a PIP before buying land

The pedido de informação prévia (PIP, prior information request) is the procedure under the RJUE, Portugal's planning and building code, in which the city council rules on whether a specific project is feasible on a specific plot. For a buyer, the benefit is a written decision that binds the council when it later assesses the building permit or the comunicação prévia (prior notification) for the same project (article 17 of the RJUE), instead of relying on the listing or your own reading of the PDM, the municipal master plan. Our guide to what a PIP is covers the procedure; this one focuses on the purchase decision.

A PIP makes sense when the price depends on what you can build: floor area, number of floors, number of homes, use or footprint. It makes even more sense when the land shows warning signs, such as a stream, a part zoned as rustic land, a road or a heritage protection zone. If the answer is no, or a very limited yes, it is better to know before you pay the deposit than after the deed.

A PIP does not replace other checks. It does not confirm ownership, charges or the registered area, it does not value the plot, and it only answers for the project described in the request. A vague question gets a vague answer.

02 You can file a PIP before you own the land

Yes. Article 14 of the RJUE lets any interested party file the request. If you are not the owner, you must identify the owner and anyone else holding a property right over the plot using the certidão do registo predial (land registry certificate), and the council notifies them that the procedure has opened.

In practice, the seller will find out about the request. So raise it during the negotiation: ask for the plot's documents (certidão permanente, caderneta predial, plans and planning history), agree on who files the PIP, and set out in the promissory contract what happens depending on the answer. The required documents are listed in Portaria n.º 320/2026/1 and explained in our list of documents for a PIP.

03 Simple or extended PIP: which one for a purchase

The RJUE has two levels. A simple PIP (article 14(1)) asks whether the project is feasible and which constraints apply: infrastructure, easements and public-interest restrictions, planning ratios, height limits (cérceas) and setbacks. An extended PIP, or âmbito alargado (article 14(2)), can also cover massing, footprint, the architectural design, the use program with the number of homes, local infrastructure, an estimate of development charges and land to be ceded to the municipality.

To buy a plot for a single-family house, a well-framed simple PIP usually answers the key question. The extended version pays off when the price depends on a precise program, such as a number of homes or a floor area per use, or when you want to know the charges before buying. It needs more design work and the council has longer to decide.

Simple PIP and extended PIP from a buyer's point of view
PointSimple PIP (art. 14(1))Extended PIP (art. 14(2))
Question answeredIs the project feasible? Which constraints, ratios, height limits and setbacks apply?The same, plus whatever you ask for: massing, footprint, design, number of homes, infrastructure, charges and land cessions
DocumentsAccess code for the certidão permanente (or a certificate of non-registration and the caderneta), 1:1,000 location plan and a short project description; drawings optionalDocuments in Part II of Annex V of Portaria n.º 320/2026/1, close to an architectural design study
Decision deadline15 days after the initial check30 days after the initial check (45 for subdivisions), extendable once for special complexity
Effect if favorableBinds the council when it decides the permit or reviews the comunicação préviaBinds the council; if it covers all applicable items a) to f), the works are exempt from a permit or comunicação prévia when carried out as assessed
When it pays offTesting use and building capacity before signing the CPCVBuying to develop, with the price tied to a number of homes or a specific floor area

04 Deadlines, tacit approval and validity in 2026

Decreto-Lei n.º 108/2026 revised the RJUE and has been in force since October 1, 2026, the date set by Decreto-Lei n.º 155-B/2026. It applies to requests filed since then and to older ones that were still at the initial check stage (saneamento).

The deadlines below are the legal ones. They do not include the time needed to prepare the request or delays caused by missing documents, so build some slack into your purchase timeline.

  • Initial check (saneamento): up to 20 days for the council to review the request and ask for corrections.
  • Decision: 15 days for a simple PIP and 30 days for an extended one (45 for subdivisions), counted from the end of the initial check or, if other bodies are consulted, from the last opinion.
  • Silence: if the council does not decide in time, the PIP is tacitly approved (deferimento tácito, article 16(6)).
  • Validity: 2 years from notification or tacit approval. Within that period you must file the permit application or comunicação prévia or, if exempt, start the works.
  • Extension: after the 2 years you can ask, once, for a declaration that the conditions still hold; the council decides within 20 days and you get 1 more year.

05 How to tie the CPCV to the PIP result

The CPCV (contrato-promessa de compra e venda) is the promissory purchase contract signed before the deed, and it is usually when you pay the deposit (sinal). If the purchase only makes sense with a favorable answer, the contract can make the deed conditional on it. Drafting is a job for the Portuguese lawyer or solicitador (a licensed Portuguese legal professional) handling the deal; the points below are the ones to discuss with them.

One point to raise with your lawyer is what counts as a "favorable answer": objective criteria linked to the program that justifies the price help avoid disputes when the council approves a smaller project or adds conditions. This guide is not legal advice on the contract.

  • Project to test: minimum acceptable use, floor area, floors, number of homes and footprint.
  • Who files the PIP and by when, who pays for preparation and fees, and which documents and cooperation the seller provides.
  • What counts as a favorable answer, including whether tacit approval is accepted and how conditions imposed by the council are handled.
  • A realistic deadline for the decision, with room for the initial check, outside consultations and a possible extension.
  • What happens to the deposit if the answer is unfavorable, falls short or has not arrived by the deadline.
  • Time limit for the deed after the decision, bearing in mind the PIP's 2-year validity.
  • Who keeps the PIP and the technical documents if the deal falls through.

06 The listing says "approved PIP": how to check it

"Plot with approved PIP" is common in Portuguese listings, but it means little without the paperwork. A PIP only covers the project, the plot and the drawings that were assessed, and only while it is valid. Ask the seller for the full file and confirm the key points with the council.

If your program differs from the one assessed, for example more homes, another use or a different footprint, the existing PIP does not answer your question. Treat it as a useful sign and consider filing a new request.

  • Title: the request form and proof of fee payment, plus the notice of the favorable decision or, if approval was tacit, proof of submission (article 16(8)).
  • Scope: whether it is a simple or extended PIP, and which items it covers.
  • Project: the use, areas, floors, homes and footprint assessed, as shown in the drawings and project description.
  • Conditions: opinions from outside bodies and any conditions set in the decision.
  • Validity: the date of notification or tacit approval, whether 2 years have passed and whether the declaration adding 1 year was obtained.
  • Follow-up: whether a permit application or comunicação prévia has already been filed on the basis of the PIP, and its status.
  • Plot: whether the boundaries and area assessed match the land you are buying.

07 What a PIP does not settle

A PIP answers planning questions. Ownership, mortgages, liens and the plot's description are in the certidão permanente from the land registry. The caderneta predial is a tax record: it classifies the property as rustic or urban for tax purposes, which is not the same as how the PDM zones the land.

A favorable PIP also no longer turns the plot into a "terreno para construção" (building plot) for IMI, the municipal property tax. Since Lei n.º 56/2023, article 6 of the CIMI requires a permit or a favorable comunicação prévia for subdivision or construction, or notice from the municipality to the tax authority that the land is buildable. And since October 1, 2026, the deed for building land must state whether the planning title was shown or whether the seller declares having it or not having it; without that statement, the sale is voidable.

  • Registry and caderneta: owner, charges, registered area and any gap with the real area.
  • Rustic land: options are limited; see what you can build on rustic land.
  • Access and utilities: water, sewage, electricity and a public road, and who pays for connections.
  • Municipal charges: development fees and any land cessions, which a simple PIP does not estimate.
  • A land planning analysis to decide what to ask in the PIP.

08 Example: a two-story house on an 800 m² plot

Illustrative example. An 800 m² plot is listed as "ideal for a house". The buyer wants a two-story home of about 220 m² of floor area. A first reading of the PDM shows a residential zone with a floor area ratio (índice de utilização) of 0.35, which would allow 280 m² if applied to the whole plot.

The analysis shows that about 150 m² lie within the 10 m margin of a stream and that, under this plan, the ratio only applies to the eligible area. With 650 m², the maximum drops to about 227 m², which still fits the program but leaves no slack. The buyer signs the CPCV with a condition: a favorable simple PIP for a house of at least 220 m², decided within four months of signing.

The council approves, with setback conditions from the stream. The buyer checks that the program fits that footprint, completes the deed and has up to 2 years from notification to file the permit application or comunicação prévia. These figures are only illustrative: every PDM has its own rules.

09 If the answer is unfavorable

An unfavorable decision must state how the project could be revised to comply with the applicable rules (article 16(5)). Read that part carefully: it often shows what the council would accept, such as less floor area, another footprint or another use.

With that information you have three paths: rework the program and file again, renegotiate the price based on what is feasible, or walk away on the terms set in the CPCV. If the council invites you to comment before the final decision, use that chance to correct misunderstandings or add documents.

10 Checklist before you sign

Use this list to prepare your conversations with the seller, your lawyer and the technical team. Our PIP preparation service covers the feasibility analysis, the planning statement signed by an architect and the filing with the council.

  • Certidão permanente, caderneta predial and location plan of the plot.
  • The minimum program that justifies the price, in writing.
  • Listing claims to verify, including any "approved PIP", with supporting documents.
  • The right type of PIP and who files it.
  • A CPCV condition with criteria, a deadline and what happens to the deposit.
  • A timeline with the legal deadlines, preparation time and slack for consultations.
  • Checks outside the PIP: registry, charges, access, utilities and municipal costs.

11 Frequently asked questions

How long does a PIP take in Portugal?

After filing, the council has up to 20 days for the initial check, then 15 days to decide a simple PIP or 30 days for an extended one (45 for subdivisions). Consultations with outside bodies and requests for corrections stretch the timeline, and you also need time to prepare the request.

Is a PIP binding?

Yes. A favorable decision binds the council when it assesses the permit application or comunicação prévia for the same project, as long as the PIP is valid. Permit applications or prior notifications filed on the basis of the PIP are also not suspended while a new plan or PDM revision is out for public consultation (article 17(8)).

How much does a PIP cost?

There are two parts: the municipal fee and the technical preparation. Each council sets its own fee; in Porto, the fee table in force when we checked in October 2026 lists €194.68 for the request, which you should confirm before filing. Preparation depends on the type of PIP and the survey needed, so ask for a quote for your case.

How long is a favorable PIP valid?

Two years from notification or tacit approval. You can ask, once, for a declaration that the conditions still hold, which adds 1 year. Within that time you must file the permit application or comunicação prévia, or start the works if the PIP exempts them.

Does an approved PIP pass to the buyer?

A PIP assesses a project on a plot, and the RJUE provides for a change of holder: the new holder proves the change to the council, which records it (article 16(10)). Before paying more for land "with a PIP", confirm with the council and your lawyer how to record the change in your case, get the title and every drawing that was assessed, and check that it is still valid.

Is a PIP worth it for rustic land?

Often, yes, because building on rustic land is the exception and depends on the PDM and on regimes such as the REN (National Ecological Reserve) and RAN (National Agricultural Reserve). A PIP gives a formal answer on the specific project. Start with what you can build on rustic land.

12 Official sources consulted

The official sources are in Portuguese. Check the version in force before preparing a notice, project or application.

Want to find these guides more easily when you search on Google? Add Apto Group as a preferred source.

Related services. To apply to your property.

Keep reading.

  1. What is a PIP? Portugal's prior information request explained How a simple PIP differs from a full one, how long the Portuguese council has to decide, what happens if it does not answer and how long a favorable answer stays valid.
  2. Land planning analysis in Portugal: a feasibility and due diligence checklist What a feasibility study checks before you buy land in Portugal, where to look up each constraint, who decides, which red flags to watch for and what you should receive at the end.
  3. Documents for a PIP in Portugal: the official list and how to prepare your filing What Portaria 320/2026/1 requires for a simple PIP and a full PIP in Portugal, what else the municipal council can ask for, and a checklist to file without requests for corrections.
  4. Favorable PIP in Portugal: how long it lasts and what to do next Two-year validity plus a one-year extension, permit exemption for a full PIP, the notice before work starts and occupancy: the path after a favorable PIP in Portugal.
  5. Can I build on rustic land in Portugal? What you can build on rustic land in Portugal: PDM exceptions, farmhouses for farmers, ruins and rebuilding, REN and RAN limits, and how to confirm it with a PIP before you buy.
  6. Can I build on my land in Portugal? How to check Five questions, in order, to read the PDM for your plot, spot constraints and building parameters, and decide when you need a binding answer from the Câmara Municipal.
  7. Buying land to build in Portugal: steps, checks and taxes The full path for buying a building plot in Portugal, from your plans to the deed and the annual property tax, with links to the guides that cover each check in depth.
  8. Approved PIP validity in Portugal: how long it lasts and how to keep it from lapsing The two-year validity, what has to happen within it, the declaration that adds one more year, PIPs issued before October 1, 2026 and a change of holder.

Have a property in mind? Tell us your idea.

We reply within about 2 hours during business hours, then prepare a proposal for your project.

geral@aptogroup.eu

Porto · Portugal

Contact details and request details
What is your situation? *