Building work without a permit in Portugal: what you can do without a license or comunicação prévia in 2026

Works exempt from prior control and works of minor urban relevance under the RJUE as revised by Decree-Law 108/2026, the role of municipal regulations, the rules that still apply and what happens if you build without the required title.

You need no permit and no comunicação prévia (prior notice) for maintenance work, interior alterations that leave the outside untouched, works of minor urban relevance such as an outbuilding of up to 10 m² and 2.2 m high set back from the public road, and a faithful reconstruction of what stood there before. Even when exempt, almost all of them must be reported to the Câmara Municipal (city council) at least five days before work starts, and they must comply with the PDM, land-use restrictions, technical rules and condominium rules. This guide follows the RJUE as revised by Decree-Law 108/2026, in force since October 1, 2026, explains what your municipality's regulation can add and shows, with examples, what happens when the work needed a title and did not get one.

To apply these checks to a property in Porto or elsewhere in Portugal, see our building legalization and prior information request services.

01 Which works are exempt from a permit and from comunicação prévia

The RJUE (Regime Jurídico da Urbanização e Edificação, Decree-Law 555/99, Portugal's planning and building code) has three ways of controlling building work: the license (permit), the comunicação prévia and, for the use of buildings, the comunicação prévia com prazo (prior notice with a waiting period). Article 6 lists the works that need none of them. These are known as works exempt from prior control, and if a project falls under comunicação prévia you cannot choose a license instead (article 4(6)).

Under the wording in force since October 1, 2026, the following are exempt from a license and from comunicação prévia:

  • Maintenance work: work that keeps the building as it was, such as restoration, repairs or cleaning.
  • Interior alterations to buildings or units that do not change the exterior and do not affect the structure or, if they do, come with a structural design and a statement of responsibility.
  • Works of minor urban relevance, explained in the next section.
  • Splitting off a single plot (destaque) under the conditions in article 6(4) and (5); see destaque or subdivision.
  • Reconstruction work, which restores the building to its último antecedente válido (last valid precedent), without adding floor area or volume.
  • Operations preceded by a favorable full PIP (pedido de informação prévia, a formal planning inquiry) covering every applicable matter, except the use or change of use; see PIP or licensing.
  • Works ordered by the council under article 89(2) and (3), the demolition of illegal buildings and the maintenance of listed buildings with a favorable opinion from the heritage authority.

02 Works of minor urban relevance: the list in article 6-A

The RJUE defines works of minor urban relevance (obras de escassa relevância urbanística) as works or technical installations that, because of their nature, size or location, have little planning impact (article 2(l)). Article 6-A sets out the national list, and all the limits apply at once: a 12 m² outbuilding, or a 9 m² one right on the sidewalk, no longer fits item (a).

The list does not apply to listed buildings or buildings in the process of being listed, to buildings within listed ensembles or sites, or, except for replacing windows, to buildings in their protection zones (article 6-A(2)). If the work is exempt, the land registry description can be updated with a declaration of works of minor urban relevance (article 6-A(4)).

Works of minor urban relevance under the RJUE (article 6-A(1), as worded since October 1, 2026)
WorkLegal limitsItem
Outbuilding, storage shed, telheiro (lean-to roof) or other structure, attached to the house or notUp to 2.2 m high, or up to the height of the house's ground floor; up to 10 m²; not bordering the public road(a)
Boundary wallUp to 1.8 m high and not bordering the public road(b)
Retaining wallUp to 2 m high, or not significantly changing the lay of the land(b)
Garden greenhouseUnder 3 m high and up to 20 m²(c)
Small outdoor landscaping, such as paths and flower bedsMust not affect public land(d)
Play or leisure equipment linked to the houseSmaller in area than the main building(e)
Solar PV panels, solar water heaters and batteriesNot larger than the roof area and not more than 1 m above the building; tanks and batteries hidden from view(g)
Wind turbine linked to the houseNot more than 4 m above the building; rotor radius up to 1.5 m; prior notification to the council(g) and (5)–(6)
Replacing exterior cladding, roofing or roofExterior finish identical to the original and better energy efficiency(h)
Replacing windows and framesSame geometry and identical exterior finish; better energy efficiency; also allowed in protection zones(j)
Demolishing any of the works aboveNo limits of its own(f)
Other worksThose the municipal regulation classifies as such(i)

03 Work inside your house or apartment

Remodeling the kitchen or bathroom, replacing floors, redoing the plumbing or taking down a non-load-bearing partition are, as a rule, exempt works. The law separates two cases. Painting, repairing or replacing like for like is maintenance; if it is purely interior, you do not even have to tell the council (article 80-A(3)). Changing the layout is an interior alteration: still exempt, but you must report the start of work.

The exemption ends once the work can be seen from outside, for example a new window, a change to the roof or to the facade, or when it removes facade tiles (azulejos), which always requires a license (article 4(2)(i)). If the work touches the structure, such as opening up a load-bearing wall, it is only exempt with a structural design and a statement of responsibility from a qualified professional confirming that, taken as a whole, the works improve or do not harm the building's stability, plus a seismic retrofit design where the law requires one. These documents are filed, for the record only, with the notice of start of work (article 6(1)(b)).

Splitting a house into two homes, or joining two units, goes beyond interior work: it affects the use and, in an apartment building, the propriedade horizontal (condominium ownership) deed. In an apartment, also check the condominium rules before you hire a contractor.

04 Lean-to roofs, pools, enclosed balconies, walls and other common cases

The most common questions are not written into the law under the names people use every day. The table applies the national rules to the cases that come up most; your municipality's regulation can widen or narrow some of these answers, as the next section explains.

Common cases: the national rule and what is usually needed
WorkRJUE ruleWhat to do
Lean-to roof, porch or covered pergolaIt counts as a structure; exempt if it meets the outbuilding limits (up to 10 m², up to 2.2 m high, away from the public road)Above that, a license or comunicação prévia; check the municipal regulation and the PDM building ratio
Swimming pool next to the houseSubject to comunicação prévia (article 4(4)(j)); not a work of minor urban relevanceA comunicação prévia with a design, even for a small pool
Enclosed balcony (marquise)It changes the facade: it is neither interior work nor on the national listA license or comunicação prévia, depending on the area; in an apartment building, condominium approval too
Wall along the streetBoundary walls are only exempt up to 1.8 m and if they do not border the public roadA municipal title and compliance with the alignment set for the street
Repainting the facadeSame color and materials is maintenance; changing the color is an alteration (article 2(d))A color change needs no title only if the municipal regulation exempts it
Extending the house, even without raising the facadeAny increase in floor area, footprint, height or volume is an extension and stopped being exempt on October 1, 2026A license or comunicação prévia, consistent with the PDM
Rebuilding a ruined houseExempt if it restores the last valid precedent, including the facades and roofProve the size and legal status of what stood there; any increase is an extension
Turning an outbuilding into a homeThe building work may be exempt, but the change of use is notA comunicação prévia com prazo for the new use, if the PDM allows it; see our guide to the habitation license

05 The role of the municipal regulation

The RJUE requires each municipality to specify, in its planning and building regulation, which works count as minor urban relevance (article 3(2)(a)). The regulation can classify other works as such (article 6-A(1)(i)) and set limits beyond those for outbuildings, walls and greenhouses (article 6-A(3)). It cannot create procedural rules or require documents that the law and the portaria (ministerial order) do not provide for (article 3(3)). Regulations are published in the 2nd series of the Diário da República (the official gazette) and on each council's website.

Two recent regulations from northern Portugal, both approved before the 2026 revision, show how far this leeway goes and why they need careful reading:

  • Ponte de Lima (Regulation 1105/2025, September 29): it allows boundary walls up to 2.0 m that do not border the public road, raising existing roadside walls to 2.0 m with railings, mesh or hedges, irrigation tanks up to 36 m², gates up to 1.2 m wide in roadside walls, and changing facade colors within the municipal color palette outside the historic center. On the other hand, it only allows one exempt outbuilding per property.
  • Chaves (Regulation 861/2025, July 17): it allows tanks up to 1.2 m high and 10 m², open-air barbecues and ovens up to 3 m² and 1.8 m high, accessibility ramps within the yard, and light farm greenhouses outside urban boundaries, and it expressly excludes swimming pools from play and leisure equipment.
  • Outdated wording: both regulations refer to article 6 of the RJUE “as currently worded”, but Ponte de Lima's still copies the 2024 exemption for extensions that do not raise the facade, which the RJUE no longer provides. Read your concelho's (municipality's) regulation and confirm the current reading with the council before you start.

06 Exempt does not mean rule-free: what still applies

The exemption removes the procedure, not the rules. Article 6(8) requires exempt works to comply with municipal plans, public-interest easements and restrictions, technical building rules and heritage protection, and the council can inspect them at any time (article 93). In practice, check the following:

  • PDM and subdivisions: an outbuilding or lean-to roof takes up footprint and can use up the ratio allowed by the PDM (Plano Diretor Municipal, the municipal master plan); setbacks from the property lines still apply. In a subdivision (loteamento), the terms of its title bind every work on the lot (article 4-A(9)). See how much you can build on your land.
  • Land-use restrictions: in the RAN (Reserva Agrícola Nacional, the national farmland reserve), the REN (Reserva Ecológica Nacional, the national ecological reserve), water domain areas or next to roads, their own rules also apply to exempt works and may require an opinion from, or notice to, another authority. See land in RAN or REN.
  • Technical rules: the repeal of the RGEU (the 1951 general building regulation) only takes effect once the law setting new technical building rules comes into force (article 25 of Decree-Law 10/2024, as amended in 2026), and safety, health and structural rules apply to any work.
  • Condominium: works that change the architectural line or the look of the building, such as enclosed balconies or facade changes, need approval from the condominium meeting by a two-thirds majority of the building's total value (article 1422(3) of the Portuguese Civil Code).
  • Neighbors: windows, doors, balconies or terraces that look directly onto the neighboring property must be at least 1.5 meters from it (article 1360 of the Portuguese Civil Code), whatever the planning procedure.

07 Before you start: notify the council and record the work

Exempt does not mean silent. At least five days before work starts, including on exempt works, the developer must notify the council and name whoever is carrying out the work, with the information required by Portaria 320/2026/1 (articles 80-A(1) and 6(12)). Only maintenance carried out entirely indoors is excused (article 80-A(3)). Within the same deadline, a notice on the approved form must be posted on site, visible from the public road (article 80-A(5)). The notification lapses if work does not start within one year (article 80-A(6)).

Some exempt works may involve fees, land transfers or a bond, payable before the start-of-work notice (article 6(13)). If the work needs scaffolding or a dumpster on the public road, occupying public space is handled separately under municipal regulations. And if one project combines exempt works with works that need a license, the exempt ones can go ahead as long as they meet the applicable rules (article 6(14)).

After the work, update the records. An outbuilding or extension that changes the property's value must be declared to the tax office (Finanças) on the IMI Modelo 1 form (IMI is the municipal property tax) within 60 days of completion (article 13(1)(d) of the IMI Code). The land registry description can be updated with the declaration of works of minor urban relevance.

08 What changed in October 2026

Between 2024 and September 2026, the Simplex Urbanístico reform (Decree-Law 10/2024) widened the exemptions. Decree-Law 108/2026 of May 29, in force since October 1, 2026, a date set by Decree-Law 155-B/2026, reversed some of them and fine-tuned others. Be wary of municipal regulations, forms and websites that still describe the 2024 rules.

Exempt works: the 2024 regime and the regime since October 1, 2026
TopicDecree-Law 10/2024 (2024 to September 2026)RJUE since October 1, 2026
ExtensionsReconstructions and extensions that did not raise the facade were exempt, even with extra floors and floor areaExtensions are no longer exempt; they need a license or comunicação prévia
ReconstructionExempt, with the same facade-height limitExempt only if it restores the last valid precedent, including facades and roof; any increase is an extension
Interior works that touch the structureA professional's statement of responsibility, which the council could ask for during an inspectionA structural design, a statement of responsibility and, where required, a seismic retrofit design, filed with the start-of-work notice
Replacing windowsMinor urban relevance if the exterior finish was identicalAlso requires the same geometry, and now applies in protection zones around listed buildings
Work done without the required titleNo specific fine for the missing titleA dedicated fine of €500 to €200,000 (individuals)

09 If you build without the required title: fines, stop-work orders and legalization

If the work did not fit any exemption, doing it without a license or comunicação prévia is an administrative offense (contraordenação). Article 98 of the RJUE sets the fines (coimas) in the table; attempts and negligence are also punishable, and the council sets the actual amount within these ranges. An exempt work can also be fined if it starts without notifying the council first.

On top of the fine, the council must restore legality, even for an exempt work that breaks the rules (article 102(1)(e)). It can issue a stop-work order (embargo), which halts the work and bars water, power and gas supply to the site (articles 102-B and 103), order corrections or order demolition. Demolition cannot be ordered if the work can be legalized, and the owner must first be heard for 15 days (article 106).

Paying the fine does not legalize the work. If it can meet the current rules, especially the PDM, the route is legalization under article 102-A, explained in our guide to how building legalization works; an old outbuilding may have another solution, described in legalizing an old house and annexes. Since October 1, 2026, the deed of sale must state whether the property has a planning title. If you are unsure which route applies, a prior information request requires the council to state which procedure the work falls under (article 16(4)); if the work is already built, Apto Group handles the file through its building legalization service.

The RJUE article 98 fines most relevant to these works
OffenseIndividualCompany
Work subject to a license, comunicação prévia or PIP done without a title (item r)€500 to €200,000€1,500 to €450,000
Work started without notifying the council, or missing required documents after notice (item c)€500 to €100,000€1,500 to €250,000
Site notice not posted or not kept visible (item j)€250 to €50,000€1,000 to €100,000
Use without the required notice, such as an outbuilding lived in as a home (item d)€500 to €100,000€1,500 to €250,000

10 Frequently asked questions

Do I need a permit to build an outbuilding?

No, if the outbuilding is up to 10 m², up to 2.2 m high (or the height of the house's ground floor) and does not border the public road: it is a work of minor urban relevance. You must notify the council five days before, comply with the PDM and setbacks, and check the municipal regulation, which can widen or narrow these limits.

Does a swimming pool need a permit?

A pool linked to a house does not need a license, but it is subject to comunicação prévia (RJUE article 4(4)(j)), with a design and statements of responsibility. It is not a work of minor urban relevance, however small. Irrigation tanks and other structures may be exempt if the municipal regulation says so.

Can I enclose my balcony without a permit?

As a rule, no. An enclosed balcony (marquise) changes the facade and is not on the national list of exempt works, so it needs a license or comunicação prévia, unless your municipality's regulation classifies it as minor urban relevance. In an apartment building, you also need approval from the condominium meeting by two-thirds of the building's total value.

Does work inside my home need approval?

It needs no permit if it does not change the exterior. Painting and repairs indoors need no notice at all. Moving partitions requires notifying the council five days before. If the work touches the structure, you need a structural design and a statement of responsibility from a qualified professional, filed with that notice.

Do I really have to notify the council about exempt work?

Yes, except for maintenance carried out entirely indoors. At least five days before work starts, the developer notifies the council, names who is doing the work and posts the notice on site. Starting without that notice is an offense, with a fine of €500 to €100,000 for individuals.

What happens if I build without a permit?

If the work needed a license or comunicação prévia, you risk a fine of €500 to €200,000 (individuals), a stop-work order, correction orders and, if it cannot be legalized, demolition. Paying the fine does not legalize the work: if it meets the PDM and current rules, the route is legalization with the council.

11 Official sources consulted

The official sources are in Portuguese. Check the version in force before preparing a notice, project or application.

Want to find these guides more easily when you search on Google? Add Apto Group as a preferred source.

Related services. To apply to your property.

Keep reading.

  1. Legalizing an old house and annexes in Portugal: pre-1951 homes, habitation licenses and outbuildings Why many old houses in Portugal have no habitation license, how to prove when a house was built, what to do with a post-1951 house without a permit, and when an annex is exempt or must be legalized.
  2. Building legalization in Portugal: how it works and when you need it The legalization procedure under article 102-A of Portugal's RJUE, step by step: when it applies, what the council can waive, fines, selling the property and what changed in October 2026.
  3. PIP, building permit or comunicação prévia: which procedure your project needs in Portugal What each procedure does under the RJUE as revised in 2026, when the law decides for you, when a PIP first is worth it and when a full PIP replaces the permit.
  4. Portugal's habitation license (licença de utilização): what it is, what replaced it and how to sort out your home's use title What the licença or autorização de utilização is, what changed with the Simplex reform and the October 2026 RJUE revision, how to get a use title for an existing home today and what happens at the deed.
  5. Portugal's RJUE in 2026: what it is and what changed under Decree-Law 108/2026 Portugal's planning and building code as in force since October 1, 2026: procedures, deadlines, PIP, comunicação prévia, building use, titles, the deed, legalization, fines and what happens to applications already filed.
  6. RAN and REN land in Portugal: can you build? The national agricultural and ecological reserves explained What the RAN and the REN are, how to check whether your plot is in either, what each regime allows, how to request the regional RAN body's opinion or file the prior notice with the CCDR, when an area can be excluded and how a PIP helps you decide.

Have a property in mind? Tell us your idea.

We reply within about 2 hours during business hours, then prepare a proposal for your project.