The Plano Diretor Municipal (PDM, the municipal master plan) is the plan that, in each Portuguese municipality (concelho), sets how land can be used: whether it is urban or rustic, which uses are allowed, how much can be built and which restrictions apply to each plot. You can view it online, on the geoportal of the Sistema Nacional de Informação Territorial (SNIT, the national planning information system) run by the Direção-Geral do Território, or on the Câmara Municipal's (municipal council's) website, and the version that counts is the one published in the Diário da República, the official gazette. This guide explains which documents make up the PDM, how to read the planta de ordenamento and the planta de condicionantes, how to tell whether the plan has been amended, is under review or suspended, and what the PDM does not answer, which is where the pedido de informação prévia (PIP), a binding pre-application ruling, comes in.
To apply these checks to a property in Porto or elsewhere in Portugal, see our prior information request service.
01 What the PDM is and who approves it
The PDM is the instrument that sets the municipality's territorial development strategy, its land, spatial planning and urban planning policy, and the concelho's territorial model, which rests on the classification and qualification of land (article 95 of the Regime Jurídico dos Instrumentos de Gestão Territorial, RJIGT, Decree-Law 80/2015, the planning-instruments law). Every municipality must have one, unless several municipalities choose a joint intermunicipal master plan instead. The câmara municipal prepares it and the assembleia municipal, the elected municipal assembly, approves it (article 90).
What makes the PDM decisive for a landowner is its legal force. National government programs, such as regional and sectoral programs, bind only public bodies; municipal plans also bind private parties directly and immediately (article 3). Program rules that affect land use must be built into the plans, so the PDM, and the plans that develop it, are where an owner finds the rules that apply to them.
The PDM covers the whole municipality and is therefore the least detailed of the municipal plans. Some areas also have a plano de urbanização (PU, urbanization plan) or a plano de pormenor (PP, detailed plan), which develop the PDM in more detail. If your area has one of these plans, it usually sets the rules for the plot. The table sums up the differences.
| Plan | Area covered | What it sets | Main map |
|---|---|---|---|
| Plano Diretor Municipal (PDM) | The whole municipality | Strategy, land classes and categories, general parameters and constraints | Planta de ordenamento (land-use map) |
| Plano de urbanização (PU) | Part of the municipality, mostly urban areas | Zoning of urban functions, road network, public facilities and parameters | Planta de zonamento (zoning map) |
| Plano de pormenor (PP) | A specific contiguous area | Urban design, plots, footprint, massing and rules for each building | Planta de implantação (site layout map) |
02 What a PDM is made of: regulations, maps and supporting documents
By law, the PDM consists of three documents: the regulations, the planta de ordenamento and the planta de condicionantes (article 97(1) of the RJIGT). These three hold the rules. The other documents accompany the plan and help you understand it, but the rules that apply to your plot are in the regulations and the maps.
In practice, many municipalities split the maps into several sheets. Porto's PDM, for example, has separate sheets for land qualification, heritage, ecological structure, natural hazards and the road network. When you check the PDM, open every sheet that makes up the land-use and constraints maps, not just the first one the geoportal shows.
| Document | What it is | What it is useful for |
|---|---|---|
| Regulations (regulamento) | The written rules: definitions, uses, parameters and exceptions | Finding out what you can do in your plot's category and within which limits |
| Planta de ordenamento | Map of land classification and qualification, planning and management units and natural-resource protection zones | Identifying the plot's land class and category |
| Planta de condicionantes | Map of the administrative easements and public-interest restrictions in force | Checking whether REN, RAN, public water domain, heritage or other easements affect the plot |
| Report and environmental report | The reasoning behind the plan's choices and an assessment of its environmental effects | Understanding why an area was zoned the way it was |
| Implementation program and financing plan | Works planned by the municipality and the state, and their financial sustainability | Finding out whether public works or utilities are planned for the area |
| Supplementary documents | Map of existing land use, map of planning commitments (permits, prior notices and favorable PIPs in force), noise map and public consultation report | Checking commitments already made in the area and noise conditions |
03 The planta de ordenamento: land classes and categories
The planta de ordenamento (land-use map) shows the municipality's spatial model: the classification and qualification of land, the planning and management units and the protection zones for natural resources and values (article 97(1)(b) of the RJIGT). Read it on two levels. The class tells you whether land is urban or rustic, the only two classes Portuguese law has recognized since 2015; the category, shown by the color and the legend, tells you what kind of area it is within that class.
The category is what points you to the article of the regulations that decides what you can build. Many PDMs also create subcategories with their own parameters, and overlay other areas on top of the zoning, such as the municipal ecological structure or the unidades operativas de planeamento e gestão (UOPG, planning and management units), areas where the plan calls for a PU, a PP or another form of implementation. If the plot lies inside a UOPG, read that unit's rules too.
A color on the map is not a conclusion. A PDM map is drawn at municipal scale and cannot be used to measure boundaries to the meter: if the line between two categories crosses your plot, ask the Câmara for a map extract or for information on how the plot is zoned. PDMs not yet updated to the 2015 rules may still show "espaços urbanizáveis" (areas zoned for future development), whose rules may be suspended; see urban or rustic land: how to check.
| Class | Usual categories | What it usually means for building |
|---|---|---|
| Urban land | Central, residential, low-density urban, economic-activity and special-use areas, and green spaces | Building is the rule, within the category's uses and parameters; a green space usually cannot take housing |
| Rustic land | Agricultural, forestry and natural areas, rural settlements and dispersed-building areas | Building is the exception: farm buildings, housing tied to a farm, tourism, works on existing buildings or homes in rural settlements, depending on the PDM |
04 The planta de condicionantes: what restricts the plot
The planta de condicionantes (constraints map) identifies the administrative easements and public-interest restrictions in force that may limit or prevent a given use of land (article 97(1)(c) of the RJIGT). The difference from the land-use map matters: the land-use map shows what the municipality decided for each area; the constraints map shows restrictions that come from other laws and apply on top of that decision, even on urban land.
The most common constraints are the Reserva Ecológica Nacional (REN, the national ecological reserve) and the Reserva Agrícola Nacional (RAN, the national agricultural reserve), the public water domain along rivers and streams, listed buildings and their protection zones, road and rail easements, power lines and pipelines, and aviation easements. Many of them ban building on a strip of the plot or require another authority's opinion. Our guide land in RAN or REN explains what each reserve allows.
The constraints map shows the restrictions as they stood when it was drawn. An easement created later applies anyway, under its own law, and mismatches between the constraints map and the land-use map are fixed through a correção material (formal correction) of the plan (article 122 of the RJIGT). If in doubt, check the SNIT geoportal, which has the REN and RAN maps, and ask the Câmara.
05 How to read the PDM regulations
The maps tell you where; the regulations tell you what. PDM regulations tend to follow a similar layout, and knowing it saves time. Since 2019, the technical terms used in plans have official definitions in Regulatory Decree 5/2019, but many PDMs were approved earlier and use older terms, such as "índice de construção" or "índice de implantação": always read the definitions in the regulations themselves.
When you open the regulations, go through these parts in this order:
- General provisions: scope, the plan's documents, how it relates to other plans and, above all, the definitions.
- Easements and public-interest restrictions: these refer you to the law behind each constraint on the map.
- Rules for the whole territory: access, parking, landscape integration, existing buildings and exceptions.
- The article for your plot's land category: allowed uses, banned uses, ratios, height, setbacks (afastamentos) and special conditions.
- Programming and implementation: UOPGs, implementation units and land dedications, which may require a PU, a PP or a subdivision (loteamento) before you can build.
- Final and transitional provisions: what happens to commitments and applications that predate the plan.
06 Where to check your municipality's PDM online
There are three public sources, and it pays to use more than one. A plan only takes effect once it is published in the Diário da República (article 191 of the RJIGT), and the published maps are linked automatically to the SNIT, where every amendment or correction produces a new full version. The Direção-Geral do Território (DGT, the national planning agency) holds every plan with all its amendments, reviews and suspensions, and each council must run its own viewing system or link to the SNIT (articles 193 and 192).
On the SNIT geoportal, the DGT's tutorial shows the way: choose the territorial scope (the municipality) and the type of instrument (PDM), display the georeferenced data and open the plan's information menu, where you will find the regulations and the list of amendments, which the SNIT calls "dinâmica". For some municipalities we have dedicated guides covering the geoportal, the PDM in force and the state of its review: Barcelos, Braga, Ponte de Lima and Vila Verde. For Porto and Lisbon, our guides to the PIP in Porto and the PIP in Lisbon show where the regulations and maps are.
Geoportals are viewing tools. If you need a document for a bank, a buyer or a design, ask the Câmara for a map extract or for information on the plans in force for the site: anyone with an interest is entitled to that information, which must be given within 15 days (article 110 of the Regime Jurídico da Urbanização e Edificação, RJUE, Portugal's planning and building law). Official map extracts usually carry a fee, listed in the municipal fee schedule.
| Source | What you find | Watch out for |
|---|---|---|
| SNIT geoportal (DGT) | Maps and regulations of the plans in force across the country, with the list of amendments; REN and RAN maps | Check the version date and whether the area has a PU or PP |
| Diário da República | The notices (avisos) that approve, amend, correct or suspend the plan, in the 2nd series | The published version prevails if anything conflicts |
| Câmara website or geoportal | The PDM, sometimes in a consolidated version, and municipal layers such as land registry, aerial photos or building lines | A consolidated version is a reading aid; check the latest amendments |
| Câmara planning department | Official map extracts, information on the plans that apply and certificates | Information on the plans that apply must be given within 15 days; the fee for extracts is in the municipal fee schedule |
07 How to tell if the PDM has been amended, is under review or suspended
A PDM is not a fixed document. It can be amended, corrected, reviewed, suspended or revoked (article 115 of the RJIGT), and each of these has different effects. A review is a full reassessment of the plan and can only take place 3 years after it came into force (article 124); the council must also produce a report on the state of spatial planning every 4 years, without which it cannot review the plan (article 189).
To find out whether anything is under way in your municipality, look for three signs. The decision to start drafting, amending or reviewing the plan is published in the Diário da República and on the Câmara's website (article 76). Procedures started since July 1, 2017 are listed on the DGT's Plataforma Colaborativa de Gestão Territorial (PCGT, the collaborative planning platform), which has a public area open to anyone. And the public consultation (discussão pública), which lasts at least 30 days for a PDM, is announced by notice in the 2nd series of the Diário da República (articles 89 and 191).
Suspension is exceptional. The assembleia municipal can suspend all or part of the PDM in exceptional circumstances, and must at the same time adopt medidas preventivas (interim protective measures) and open an amendment or review procedure (article 126). Interim measures can also be adopted for an area whose plan is being reviewed; they can ban, restrict or make subject to a binding opinion subdivisions and building works, and they last up to 2 years, extendable by 1 more (articles 134 and 141). There is also a separate case: in PDMs not updated to the land classification rules by December 31, 2024, the rules for areas zoned for future development can be suspended by the Comissão de Coordenação e Desenvolvimento Regional (CCDR, the regional planning authority).
| Situation | What it is | What changes for you |
|---|---|---|
| Amendment (alteração) | A change to part of the rules or of the plan area; includes updates to match new laws or plans and the simplified amendment | The rules for the amended area change from publication; check which version is in force |
| Formal correction (correção material) | Fixes to mapping, mismatches between maps or obvious errors | Can move a boundary line without changing the plan's policy |
| Review under way | A full reassessment of the plan, with a new public consultation | The PDM in force still applies, but applications can be put on hold from the public consultation (next section) |
| Interim protective measures | Temporary rules to prevent changes that would undermine the new plan | They suspend the plan in the area covered; works and subdivisions may be banned or need an opinion |
| Plan suspension | An exceptional decision of the assembleia municipal or the national government, with a set term and area | In the suspended area, the interim measures apply instead of the PDM rules |
| Suspension of areas zoned for future development | The consequence of not updating the PDM to the land classification rules, declared by the CCDR | As a rule, no operations that occupy or transform land can take place in those areas, except for the legal exceptions |
08 PDM under review: what happens to applications and how to protect yourself
Until the review comes into force, the current PDM applies, unless interim protective measures cover the area. The critical moment is the public consultation. From the date set for its start, in areas covered by new planning rules, PIP requests, permit applications and prior notices (comunicações prévias) are put on hold until the new plan comes into force, and are then decided under the new rules (article 145 of the RJIGT). If the new plan has not come into force 180 days after the public consultation began, the hold ends and the application is decided under the rules in force at that time.
The hold does not apply to reconstruction or alteration works on existing buildings that do not create or worsen nonconformities, or that improve safety and sanitary conditions. Anyone whose application is on hold can also file a new one under the rules of the plan out for consultation, with the decision depending on that plan coming into force.
The best protection is to have the Câmara's position before the public consultation. Permit applications or prior notices filed on the basis of a favorable PIP are not put on hold (article 17(8) of the RJUE), and interim protective measures do not apply to anyone who already holds a valid favorable PIP or approved architectural design (article 134(5) of the RJIGT), except in exceptional cases, with a right to compensation. If your municipality's PDM is under review and you need to know what you can build, settle the design and file the PIP early.
09 What the PDM does not tell you, and when to request a PIP
The PDM sets the rules for each area, but it does not apply them to your project. When that application decides the purchase or the design, the next step is the pedido de informação prévia (PIP) under the RJUE, as revised by Decree-Law 108/2026 and in force since October 1, 2026. The Câmara decides within 15 days for a simple PIP and 30 days for an extended one (45 for subdivisions), counted from the end of the initial completeness check (saneamento) or from the last outside agency's opinion; if it misses the deadline, the request is deemed approved by default (deferimento tácito). A favorable ruling binds the competent authorities for 2 years.
Approval by default does not make lawful what the PDM does not allow: prior information that breaches a municipal plan, interim protective measures or provisional rules is void (article 68 of the RJUE). You do not have to own the land to request a PIP. See our full PIP guide, the step-by-step guide to whether you can build on your land and the math of how much you can build.
Reading the maps and regulations carefully clears up many questions, but some only the Câmara can settle. The PDM does not tell you, for example:
- Whether an existing building on the plot is legal: that is in the Câmara's building file, not in the PDM.
- The exact area and boundaries of the property, which depend on the topographic survey, the land registry and the cadastre.
- How the Câmara reads an ambiguous rule, a category boundary that crosses the plot or an exception in the regulations.
- The rules of an approved subdivision, a PU or a PP for the area, and the municipal bylaws on urbanization, building and fees.
- Whether water, sewer and power reach the plot and who pays for the connection.
- What outside agencies, such as the CCDR, the RAN authority or the heritage authority, will say when the plot has constraints.
10 Frequently asked questions
What does PDM stand for?
PDM stands for Plano Diretor Municipal, the municipal master plan. Every Portuguese municipality must have one: it zones land as urban or rustic, sets the use categories and building parameters, and identifies the constraints. It is approved by the assembleia municipal and binds private parties directly.
Where can I check my municipality's PDM online?
On the SNIT geoportal run by the Direção-Geral do Território, which holds the plans in force across the country, and on the Câmara Municipal's website or geoportal. The notices approving and amending the plan are in the Diário da República, and the published version prevails if anything conflicts.
What is the difference between the planta de ordenamento and the planta de condicionantes?
The planta de ordenamento shows the land class and category, that is, what the municipality decided for each area. The planta de condicionantes shows easements and public-interest restrictions, such as REN, RAN, public water domain or heritage, which come from other laws and restrict the plot on top of the zoning.
My municipality's PDM is under review. Can I still request a PIP or a permit?
Yes, and the PDM in force still applies. From the start of the review's public consultation, applications in areas with new rules are put on hold until the new plan comes into force, for up to 180 days. Permit applications or prior notices based on a favorable PIP are not put on hold, so it pays to request one first.
Is what I see on the geoportal legally binding?
The geoportal is a viewing tool. What counts is the plan published in the Diário da República, with later amendments. For an official document, ask the Câmara for a map extract or for information on the plans in force for the site, which must be given within 15 days.
If the PDM says I can build, do I need a PIP?
It is not mandatory, but the PDM does not apply the rules to your project. If the investment depends on the answer, if the plot has constraints or if a rule is ambiguous, a favorable PIP gives you a binding position from the Câmara for 2 years.
11 Official sources consulted
The official sources are in Portuguese. Check the version in force before preparing a notice, project or application.
- Diário da República — RJIGT (Decree-Law 80/2015, consolidated)
- Diário da República — RJUE consolidated, republished by Decree-Law 108/2026
- Diário da República — Regulatory Decree 15/2015
- DGT — SNIT geoportal
- DGT — Plataforma Colaborativa de Gestão Territorial (PCGT)
- DGT — RJIGT frequently asked questions (in Portuguese)
Want to find these guides more easily when you search on Google? Add Apto Group as a preferred source.