Skip to content

Santo Tirso PDM: the 2nd revision in force and how to check your plot

Which PDM has been in force in Santo Tirso since July 2026, what changed with the 2nd revision, how to read the maps on the Câmara's Geoportal, which rules apply to your plot and when to request a PIP.

The PDM in force in Santo Tirso is the 2nd revision of the Plano Diretor Municipal (the municipal master plan), approved by the Assembleia Municipal (the municipal assembly) on April 30, 2026 and published in the Diário da República, Portugal's official gazette, as Aviso n.º 16577/2026/2 of July 2, 2026. According to the Câmara Municipal de Santo Tirso (the city council), it has been in force since July 17, 2026 and replaced the 2011 PDM. The new boundaries of the municipality's Reserva Ecológica Nacional (REN, the national ecological reserve) were published on September 8, 2026. The regulations and maps can be viewed on the council's Geoportal. This guide explains what the plan is made of, what changed, how to read the maps for your plot, the figures the regulations set and when it is worth filing a pedido de informação prévia (PIP), the council's binding pre-application ruling.

To apply these checks to a property in Santo Tirso, see our prior information request and building legalization services.

01 Which PDM is in force in Santo Tirso

The Plano Diretor Municipal (PDM) is the plan that zones all the land in a municipality; the general PDM guide explains how it works. In Santo Tirso, the plan in force is the 2nd revision, approved by majority vote of the Assembleia Municipal at its session of April 30, 2026 and published as Aviso n.º 16577/2026/2 in Diário da República no. 126, 2nd series, on July 2, 2026. The regulations set the effective date at 10 days after publication (article 132), and the council states that the plan has been in force since July 17, 2026.

The revision repealed the PDM published as Aviso n.º 1858/2011 of January 18, 2011, and its amendments (article 131). The plan stays in force until the next revision, which must take place when an evaluation makes it necessary or mandatory (article 132). The table sums up the process, which began in 2018.

2nd revision of the Santo Tirso PDM: the dates that matter
DateStageWhat happened
October 18, 2018Start of the revisionThe council resolved to start the 2nd revision, published as Aviso n.º 16958/2018 of November 22
December 20, 2024Advisory committeeConditional favorable opinion on the final draft of the plan
April 30 to August 1, 2025Public consultationOpened by Aviso n.º 10631/2025/2 of April 22, 2025, following a council resolution of March 20
April 30, 2026Assembleia MunicipalApproval of the 2nd revision, including the changes made after weighing the submissions and agency opinions
July 2 and 17, 2026Publication and entry into forceAviso n.º 16577/2026/2 published on July 2; plan in force since July 17, according to the council
September 8, 2026Reserva Ecológica NacionalNew REN boundaries for the municipality published, drawn up as part of the revision (Aviso n.º 22134/2026/2)

02 What changed with the 2nd revision and what is underway in November 2026

The revision reorganized the zoning categories. The 2011 PDM split the territory into urban land and rural land; the 2026 plan classifies all of it as solo urbano (urban land) or solo rústico (rustic land) (article 7) and creates categories that did not exist before, such as rural settlements and low-density urban areas. It also repealed the Margens do Ave urban plan and the detailed plans for Quinta de Geão and the Fontiscos industrial zone, whose areas are now governed by the PDM (article 131). If you hold information, a map or an opinion from the council dated before July 17, 2026, the category it shows may no longer exist.

As of November 1, 2026, neither the council's PDM page, updated on October 28, nor the platform of the Direção-Geral do Território (DGT), the national planning agency, lists any procedure to amend, correct or suspend the 2nd revision; at the DGT, the procedure is at the filing stage. What is underway is the drafting of the 170 Park detailed plan, for a business area at Monte Fidalgo in the parish union of Lamelas e Guimarei: the council resolved to restart it on June 25, 2026, with a two-year deadline (Aviso n.º 18164/2026/2). Until that plan is approved and published, the PDM applies there.

Zoning categories in the Santo Tirso PDM: 2011 and 2026
Land class2011 PDM (Aviso n.º 1858/2011)2026 PDM (Aviso n.º 16577/2026/2)
Urban landResidential areas (types I to IV), industrial, public facilities, tourism/residential and urban green spaceCentral areas, residential, low-density urban, business, special use and urban green space
Rural land (2011) or rustic land (2026)Agricultural, forest (multifunctional and main) and extractive industry areasAgricultural, forest (production and landscape enhancement), energy and mineral resource extraction, rural settlements, cultural areas and infrastructure and facilities areas
Other municipal plansMargens do Ave urban plan and detailed plans for Quinta de Geão and the Fontiscos industrial zone in forceRepealed; the detailed plans for the Picaria (2018) and Quinta da Chinesa (2022) industrial zones remain

03 What the Santo Tirso PDM is made of

The plan is made up of the regulations, with four annexes (cultural heritage, scheduled development areas, guidelines of the Entre Douro e Minho regional forest plan and areas excluded from the REN), five plantas de ordenamento (land-use maps) and two plantas de condicionantes (constraints maps), for a total of 7 maps and 49 sheets (article 2). They come with, among other documents, the report, the implementation program, the environmental report, the heritage map and the noise map.

Read every map, not just the land classification one. Public easements and restrictions apply even when they are not drawn, and the strictest rule always prevails; and if the constraints map does not match the land on the ground, the ground wins, as shown by an up-to-date topographic survey (article 6). For the agricultural and ecological reserves, see the guide on RAN and REN land. The table shows what to look for on each map.

Santo Tirso PDM maps (Aviso n.º 16577/2026/2) and what to check
MapWhat it showsWhy it matters
Land use I — Land classification and zoningUrban or rustic land, the zoning category, areas to be structured, UOPGs and detailed plans in forceSets the permitted uses and building limits
Land use II — Environmental and heritage safeguardsMunicipal ecological structure, archaeological heritage, buildings of municipal interest and the city's historic core (Área Matricial)At a level A archaeological site, any work affecting the ground requires a prior assessment (article 88)
Land use III — Safeguards — RisksFlood risk areas by hazard class, flood zones, maximum infiltration zones and landslide risk areasThere are bans on building, on basements and on bedrooms below the flood level (articles 70, 71 and 79)
Land use IV — Safeguards — Noise zoningNoise classification and conflict areas, based on the noise mapRestricts where noise-sensitive uses such as housing can go (articles 57 and 84)
Land use V — Implementation scheduleAreas to be structured, areas awaiting infrastructure and planning and management units (UOPGs)In an area to be structured, development normally proceeds through implementation units and requires public water and sewer networks (article 111)
Constraints I — Natural resources, heritage and infrastructurePublic water domain, RAN, REN, listed heritage, roads, railway, utility networks and other easementsEach easement's own rules apply on top of the PDM (article 6)
Constraints II — Priority prevention and safety areas and defense networksPriority prevention and safety areas and rural wildfire defense networksExtensions to existing buildings in these areas must comply with the integrated rural fire management system (article 17)

04 How to check the Santo Tirso PDM on the Geoportal

The council states that the full version of the PDM in force can be viewed on the Geoportal (websig.cm-stirso.pt/geoportal), under «Plano Diretor Municipal 2.ª Revisão», or at its climate transition, land and public space department (Departamento da Transição Climática, Território e Requalificação do Espaço Público). The published regulations and maps are also in the PDF of Aviso n.º 16577/2026/2 in the Diário da República. The same Geoportal has the entries «Emissão de Plantas de Localização» (location maps), «Outros Instrumentos de Gestão Territorial» (other plans), «Áreas de Reabilitação Urbana» (urban regeneration areas), «Loteamentos» (subdivisions) and «Defesa da Floresta» (forest fire defense).

The geoportal is a viewing tool: if anything differs, the plan published in the Diário da República prevails. If you use the national SNIT geoportal run by the DGT, make sure you are looking at the 2nd revision and not the 2011 plan. The steps:

  • Open the «Plano Diretor Municipal 2.ª Revisão» entry rather than the other plans, so you know you are reading the plan in force since July 2026.
  • Find the property on the map with the zoom and pan tools, and check the boundaries against the caderneta predial (the property tax record) or a survey.
  • Read Land use map I to see whether the property is on urban or rustic land, in which category, and whether it sits in an area to be structured or a detailed plan.
  • Turn on the safeguards and constraints maps, especially the risks map: flood zones and flood risk areas change what can be built.
  • Get the location map from the «Emissão de Plantas de Localização» entry; you will need one for any application to the council.
  • Open the regulations at the article for the category and also read the general conditions (articles 9 to 17), which apply across the municipality.

05 How much you can build on urban land in Santo Tirso

On most urban land in Santo Tirso, the rule is not a ratio, it is the surroundings. New buildings follow the dominant built form of the urban fabric around them, above all building lines, facade height and massing (article 42). The figures in the table only apply in areas to be structured, in subdivisions and in high-impact projects that create new roads, or where the surroundings offer no reference or one that does not fit the category. That is why two plots in the same category can get different answers.

Some rules apply everywhere. Balconies, carports and porches, basement parking and storage, and plant rooms do not count toward the floor area ratio (article 12). Floors are counted above the ground-floor threshold level, and basements are allowed in every category (article 16). Outbuildings are normally limited to 1 floor (article 15). For controlled-cost housing or affordable rentals for 25 years, the ratio can rise by 0.2 in central areas and 0.1 in residential areas (article 45). The guide how much can I build on my land explains the concepts.

Urban land limits in the Santo Tirso PDM (articles 47 to 64)
CategoryWhat it isLimits
Central areaThe municipality's main centersFloor area ratio 1.8 and up to 70% impervious cover; single-family or two-family houses only as infill or at the edge, with 3 floors, ratio 0.6 and 60%
Residential areaAreas for denser housing4 floors, ratio 1.0 and up to 60% impervious cover; single-family or two-family houses with 3 floors and ratio 0.6
Low-density urban areaSettlements at the transition to rustic land2 floors and up to 60% impervious cover, no ratio; houses with 3 floors if they leave no exposed party walls and no facade exceeds 10 m; apartment buildings with 3 floors and ratio 0.8, only in the cases of article 54
Business areaIndustry, warehouses and logistics2 floors and up to 80% impervious cover; other uses 3 floors and 60%; housing only under the exceptions of article 57
Special use areaMajor facilities and infrastructureWhatever the activity requires, with up to 75% impervious cover
Urban green spaceParks, gardens and buffer areasOnly renovation and extension of existing buildings, with up to 10% impervious cover

06 Rustic land in Santo Tirso: what the 2026 PDM allows

Rustic land is meant for farming, livestock and forestry and for conserving natural assets, and any building must be the minimum the activity needs (articles 20 and 24). In agricultural areas, a new home is only allowed in two cases: a single-family house on a farm estate (quinta) of at least 10,000 m², with 2 floors and a floor area ratio of 0.05; or a farmer's house, under the conditions of the Reserva Agrícola Nacional (RAN, the national agricultural reserve) rules, with 2 floors and a ratio of 0.1 (articles 23 and 24). On a 10,000 m² plot, a ratio of 0.05 gives 500 m² of floor area.

In forest areas, new homes are not among the permitted uses; landscape enhancement forest areas allow rural tourism, turismo de habitação (stays in manor houses) and outbuildings for an existing home (article 26). The category where housing is the main use is the rural settlement: built-up clusters on rustic land that allow 2 floors and up to 60% impervious cover, with no floor area ratio, and exceptions for renovation, infill plots and rural hotels, which can have 3 floors (articles 32 to 34). Without public water or sewer service, a private system in a low-density urban area or on rustic land needs approval from the environmental authority (article 9(3)).

See what can be done on rustic land and when rustic land can be reclassified as urban. With the plan now published, reclassifying rustic land as urban can only come from a new plan procedure decided by the municipality.

Building in agricultural areas under the Santo Tirso PDM (article 24)
UseFloorsRatio or limit
Farm support buildingsNot setFloor area ratio 0.2
Single-family house on a farm estate of at least 10,000 m²2Floor area ratio 0.05
Farmer's house, under the RAN rules2Floor area ratio 0.1
Tourism developments2Floor area ratio 0.2; extensions of existing buildings up to 50%
Industry, warehouses, retail and services linked to farming and forestryNot setFloor area ratio 0.5 and up to 60% impervious cover

07 Floods, slopes and heritage: the safeguards that matter most

Santo Tirso sits on the Ave river and its tributaries, and Land use map III is the one that most often changes the answer. The regulations separate the areas at significant potential flood risk, by hazard class, from other flood zones, and add maximum infiltration zones and landslide risk areas. These rules apply on top of the zoning category, and the strictest prevails (article 68). Check whether the property is affected by any of the following:

  • Very high, high or medium flood hazard on urban land: construction and subdivisions are banned, except in consolidated urban areas with an opinion from the national water authority (in the very high and high classes, only as infill); basements are not allowed (article 70).
  • Low or very low hazard: no basements and no bedrooms below the flood level set for the site (articles 70 and 71).
  • Flood zone outside those areas: new buildings only under the exceptions of article 79, such as infill in consolidated urban fabric or replacing lawful buildings, and never with basements.
  • Landslide risk area: building or adding floors requires a geotechnical study showing there is no risk (article 83).
  • Archaeological heritage: at level A, any work affecting the ground requires a prior assessment; at level B, archaeological monitoring (article 88).
  • Historic core of Santo Tirso (Área Matricial): work must fit the massing and materials of the surrounding buildings (article 90).

08 Existing buildings, prior approvals and legalization

The new PDM protects what already had a permit. Existing buildings that did not need a license, and licensed buildings with a valid permit, count as pre-existing (article 17). If they do not comply with the plan, extensions and ancillary buildings are allowed to renovate, improve living conditions or support the business on site, within the category's floor limit and 60% impervious cover; the extension cannot exceed twice the floor area existing when the plan took effect or, if that area is under 150 m², cannot exceed 300 m².

Article 127 protects valid planning rights that predate the plan and arise from prior planning control. A favorable PIP that is still valid binds the council when it decides the license or prior notice for the same project; check the PIP's validity before relying on it. For unpermitted work physically in place before the plan took effect, article 129 opens a special legalization regime, which can only end favorably if the uses are compatible, the breach of limits causes no unacceptable harm and the easements are respected. The process is in the guide on how building legalization works.

09 PIP in Santo Tirso: filing, fees and when to request one

Reading the PDM gives you an interpretation; a decision on a pedido de informação prévia (PIP) gives you an answer that binds the council. Under the RJUE (Regime Jurídico da Urbanização e Edificação, Portugal's planning and building code) as revised by Decree-Law 108/2026, in force since October 1, 2026, a simple PIP confirms feasibility and constraints, and an extended PIP can also set massing, footprint and number of dwellings. The council has up to 20 days for its initial check and then decides within 15 days (simple) or 30 days (extended; 45 for subdivisions); without a decision in time, the PIP is tacitly approved, and a favorable answer is valid for 2 years. You do not need to own the property to apply. The PIP guide explains the rules.

In Santo Tirso, a PIP for building work is filed online on the council's platform, after registering and signing in, or on paper at the front desk. The list of attachments includes extracts of the land-use and constraints maps, and the required documents are those of Portaria 320/2026/1, explained in the guide to documents for a PIP. According to the procedure page, updated on October 7, 2026, the review costs €52.70 under article 14(1) of the RJUE; under article 14(2), €26.36 for walls and fences or buildings up to 60 m², €72.45 for housing up to 200 m², €111.95 up to 10 units or 1,000 m² and €221.26 above that. In Santo Tirso, a PIP is worth it when:

  • The plot changed category with the 2026 revision, or the information you have from the council predates July 17, 2026.
  • What you can build depends on the built form of the surroundings, and you need to know which height and building line the council will accept.
  • The property is in an area to be structured, an area awaiting infrastructure or a UOPG.
  • You want to build a house on rustic land, on a farm estate, in a rural settlement or as a farmer.
  • The property is affected by a flood zone, flood or landslide risk, archaeological heritage, the RAN or the REN.
  • You are buying and want the promissory contract to depend on the answer: see PIP before buying land. Apto Group prepares and follows up your PIP in Santo Tirso.

10 Frequently asked questions

Which PDM is in force in Santo Tirso?

The 2nd revision of the Plano Diretor Municipal, approved by the Assembleia Municipal on April 30, 2026 and published as Aviso n.º 16577/2026/2 in the Diário da República on July 2, 2026. According to the council, it has been in force since July 17, 2026 and replaced the 2011 PDM.

Is any amendment to the Santo Tirso PDM underway?

As of November 1, 2026, neither the council nor the DGT platform lists any amendment, correction or suspension of the 2nd revision. The 170 Park detailed plan, in Lamelas e Guimarei, is being drafted, and it will only change the rules for that area once it is approved and published.

Where can I check the Santo Tirso PDM online?

On the council's Geoportal (websig.cm-stirso.pt/geoportal), under «Plano Diretor Municipal 2.ª Revisão», which the council lists as the full version in force. The regulations and maps are also in the PDF of Aviso n.º 16577/2026/2. If anything differs, the version published in the Diário da República prevails.

Can I build a house on agricultural land in Santo Tirso?

Only in two cases: on a farm estate of at least 10,000 m², with 2 floors and a floor area ratio of 0.05, or as a farmer's house under the RAN rules, with a ratio of 0.1. First check whether the plot is actually in a rural settlement or a low-density urban area, where housing is the main use.

How many floors can I build in a low-density urban area?

Normally 2 floors above the threshold level, with up to 60% impervious cover. A single-family or two-family house can have 3 floors if it leaves no exposed party walls toward the neighbors and no facade exceeds 10 m. Where the street has a clear built form, the surroundings prevail.

How much does a PIP cost in Santo Tirso?

According to the council's procedure page, the review costs €52.70 under article 14(1) of the RJUE and, under article 14(2), between €26.36 and €221.26 depending on the project; for housing up to 200 m², €72.45. Technical preparation is a separate cost.

11 Official sources consulted

The official sources are in Portuguese. Check the version in force before preparing a notice, project or application.

Want to find these guides more easily when you search on Google? Add Apto Group as a preferred source.

Related services. To apply to your property.

Keep reading.

Have a property in mind? Tell us your idea.

We reply within about 2 hours during business hours, then prepare a proposal for your project.

geral@aptogroup.eu

Porto · Portugal

Contact details and request details
What is your situation? *